Parallel Session II

Room 2 2020-09-23
1:00 pm - 3:00 pm (GMT+7)

Photovoltaic System

1:10 pm – 1:30 pm (GMT + 7)

Construction of Floating PV on Teritip Dam Balikpapan to Provide Renewable Energy for Indonesia’s New Capital

ICT-PEP – 1570655946

1:30 pm – 1:50 pm (GMT + 7)

Design and Implementation of DC-DC SEPIC Integrated with Boost Converter for Photovoltaic System

ICT-PEP – 1570652292

1:50 pm – 2:10 pm (GMT + 7)

Hosting Capacity Analysis for PV Rooftop in Indonesia, Study Case in Gayo Lues District, Aceh

ICT-PEP – 1570655890

2:10 pm – 2:30 pm (GMT + 7)

Methodology to Reduce Production Cost by Injecting PV System in Industrial Load Management

ICT-PEP – 1570652151

2:30 pm – 2:50 pm (GMT + 7)

Determining the Cost of Clinic-in-a-Box for a Better Healthcare in Rural Indonesia

ICT-PEP – 1570652009